Which interim management firm should you choose to transform an industrial subsidiary?
To transform an industrial subsidiary or restructure several sites in France, the right interim management firm proposes managers who know the shop floor, labour relations and what a group expects. Industry has become the leading market for interim management: it accounted for 52.6% of assignments in the first half of 2026, up from 45.6% a year earlier, according to the France Transition barometer. Luc Marot, President of ADN Transition and active in interim management since 2005, explains the criteria for choosing well.
In brief
– More than one interim management assignment in two now concerns industry, and industrial management is the fastest-growing function.
– For an industrial subsidiary, three criteria matter: experience in the sub-sector, handling labour relations across several sites, and familiarity with group reporting.
– ADN Transition presents 1 to 3 managers within 48 hours, and its partners, all former operational executives, steer the assignment through to completion.
Why has industry become the leading market for interim management?
According to the France Transition barometer for the first half of 2026, published by the French federation of interim management firms, of which ADN Transition is a member:
– industry accounts for 52.6% of assignments, a gain of more than 7 points in one year;
– within industry, manufacturing represents 42.0% of assignments (up from 35.1%) and energy and environment 19.0% (up from 12.5%);
– aerospace, space and defence are growing in volume, with 106 assignments compared with 95;
– industrial management is the fastest-growing function, at 19.5% of assignments, up from 16.3%;
– operational project management (19.5%) and crisis or turnaround assignments (10.9%) are gaining ground.
These figures reflect an industry under pressure: energy transition, reshoring, cost and supply tensions. Companies need executives who can act quickly on one site or across a network of plants, for a limited period.
Which industrial assignments can you entrust to an interim manager?
The needs of an industrial subsidiary take several forms. Each calls for a different manager profile.
| Type of assignment | Typical situations | Profile to look for |
|---|---|---|
| Plant management or industrial management | Departure of the director, struggling site, production ramp-up | Plant manager or industrial director from the same sub-sector (continuous process, assembly, food, chemicals…) |
| Transformation and performance plan | Productivity, quality, lean, workshop reorganisation | Transformation manager who has already led a performance plan with measured results |
| Multi-site restructuring | Closure or consolidation of sites, transfer of activity, redundancy plan | Interim industrial director or HR director experienced in labour relations and collective procedures |
| Supply chain | Supply disruptions, logistics overhaul, ERP change | Supply chain director who has managed flows across several sites |
| Carve-out or integration | Sale of a business, acquisition of a site, separation from a group | Manager experienced in mergers and acquisitions and in separating systems |
What criteria should you use to choose an interim management firm for an industrial subsidiary?
Do the proposed managers know your sub-sector?
A plant is not transformed in the same way in food, chemicals, automotive or aerospace. Safety, quality, certification and customer relationship constraints differ. The firm should propose managers who have already led a comparable transformation in a similar environment.
Can they handle labour relations across several sites?
A multi-site restructuring involves several works councils, worried teams and attentive local officials. The manager must know how to inform, consult and negotiate without losing the timetable. This is often what makes or breaks the assignment.
Are they used to reporting to a group?
In a subsidiary, the interim manager answers to a headquarters, sometimes abroad, while leading local teams. They must keep up with group reporting and stand up for the reality on the ground.
Is the firm led by partners with an operational background?
A partner who has run a company themselves knows how to challenge the manager’s roadmap and spot a gap early.
At ADN Transition, the partners, all former operational executives, qualify the need and then steer the assignment from the first conversation to the end.
How quickly does the firm present profiles?
A plant without a director or a delayed restructuring plan costs money every week. ADN Transition commits to presenting 1 to 3 managers within 48 hours, selected from a pool of more than 5,000 profiles.
Does the firm follow a verifiable code of ethics?
ADN Transition is a member of France Transition, the French federation of interim management firms, holds a Bureau Veritas certification and publishes its ethical commitments. The firm is listed in the “Strong reputation” category of the Décideurs 2025 ranking for HR interim management.
Multi-site restructuring: what are the main steps?
1. Establish the diagnosis. Analyse the performance, costs and prospects of each site, then share the findings with management and the group.
2. Build the scenarios. Consolidation, site specialisation, transfer or closure: cost each option, including its social cost.
3. Inform and consult employee representatives. Prepare the works councils concerned, follow the legal procedures and timetable, and document each step.
4. Support employees. Redeployment, transfers between sites, support measures: this is where the trust of the remaining teams is won or lost.
5. Execute site by site. Transfer production, secure customers and supplies, track each site’s indicators.
6. Stabilise and hand over. Hand a lasting organisation over to permanent management.
How much does an industrial interim manager cost, and for how long?
According to the France Transition barometer for the first half of 2026:
– the average daily rate for transformation, crisis or project management assignments is €1,494, up 6.0% year on year;
– the daily rate for gap management, that is, replacing an absent executive, is €1,057;
– 52.1% of assignments fall between €1,000 and €1,500 per day;
– a transformation, crisis or project assignment lasts 8 months on average, compared with 6 months for gap management.
The daily rate covers both the manager and the firm’s support. The rise in the daily rate for transformation assignments reflects the value placed on profiles able to lead complex industrial projects.
How does ADN Transition support industrial companies?
An ADN Transition partner, a former operational executive, qualifies the need with the subsidiary’s management and, where necessary, with the group. The firm then presents 1 to 3 managers within 48 hours, and the partner steers the assignment through to completion, in France and elsewhere in Europe.
Julien Coeurdacier, Managing Director France at Storck, says (translated from French):
“This relaunch of sales required us to be ready on 1 March, and everything was ready on 1 March.”
Read also: Our history with Julien Coeurdacier, Managing Director France at Storck
ADN Transition at a glance
– Interim management firm founded in 2013
– More than 5,000 interim managers in its pool
– 6 partners and 7 senior advisors, all former senior executives
– Member of France Transition, Bureau Veritas certified
– Values: high standards, availability and sincerity
Frequently asked questions
What is an interim industrial director?
An experienced industrial director or plant manager brought in for a limited period. They replace an absent executive or lead a specific project: performance plan, restructuring, production ramp-up, site integration.
Can an interim manager lead a redundancy plan?
Yes. It is a common assignment. The interim manager, often working with an interim HR director, prepares the project, runs the information and consultation process with employee representatives and oversees implementation, with support from the company’s legal advisers.
How long does an industrial transformation assignment last?
According to the France Transition barometer, transformation, crisis or project management assignments lasted 8 months on average in the first half of 2026. The duration depends on the scale of the project and the number of sites involved.
Can a single manager steer several sites?
Yes, to coordinate a restructuring or performance plan across a network of plants. Depending on the scale, they rely on the existing site managers or on other interim managers, coordinated by the same firm.
An industrial project to lead?
Does your industrial subsidiary need to transform or reorganise its sites? Discuss your project with an ADN Transition partner.
Our track record: examples of interim management assignments
Interim management in retail: which firm should you choose for a store network?
International expansion: how can an interim manager support your growth abroad?